Class 320 Refresh 01

Interior Refresh and Abellio Franchise Modifications

Project Info

The Scope of work entailed the design and execution of a full interior refresh: full interior and cab re-paint and floor renewal, CCTV system, at seat power system, LED lighting, new cycle storage area.

As with every project it was essential for GRS to ensure cost effective and timely mobilisation. In advance of the production phase, and following to design approval, the BOM had been identified and all materials ordered. Materials identified as Long Lead Items were ordered in advance of BOM completion to ensure there was no delay in the production phase. A selected set of sub-suppliers were utilised to ensure an excellent level of quality and delivery.

For GRS, Class 320 Refresh represents a best-in-class example of learning through the lessons-learned process. As per industry-wide practice, an extended throughput time was allocated on the first three units. Moreover, Unit 2 was delivered 5 working days ahead of schedule, thanks to the lessons-learned reviews carried out to understand and promptly correct the problems that are naturally expected at the beginning of a project of that scale.

Furthermore, in order to capture learning, continuous feedback to the shop floor staff has been provided. Toolbox talks and “buddy system” (each worker checks one of their peers’ work) on critical tasks have been included, supported by the feedback of the project engineer to clarify any technical issues.

On the Class 320 Refresh, staff competency is constantly monitored according to corporate standards, ensuring each task is carried out by members of staff having the required level of competency. Strict control on this aspect of the Class 320 Refresh project has led to a consistent delivery of high-quality units.

Finally, Eversholt carry out an output inspection on every unit, resulting on a consistently decreasing number of snags highlighted on output through the project. Feedback received from Eversholt and ScotRail has confirmed that the project, albeit quite invasive in scope, has not had any detrimental impact on fleet performance and has delivered a greatly enhanced customer experience.

Project Stats.

Vehicle Class
320

Number of Cars
66

Customer
Eversholt

Operator
ASR

Scope of Work
Refresh & Mods

Duration
2017-2019

Efficient Maintenance and Reliable Service. We restore rolling stock through precision overhaul, maintenance, repair & modernisation.

We restore rolling stock through precision overhaul, maintenance, repair & modernisation.

Address

Gemini Rail
Services UK Ltd
Wolverton Works
Stratford Road
Wolverton
Milton Keynes
MK12 5NT


Contact

T. +44 (0) 1908 574400

E. info@geminirg.com

Follow us

At Gemini Rail Services we are committed to protecting and preserving the privacy of our visitors when visiting our site or communicating electronically with us. Our Privacy Policy has been provided and approved by the online solicitors at LegalCentre.co.uk.

This Privacy Policy contains an explanation of what happens to personal data that you choose to provide to us, or that we collect from you whilst you visit this site. Our Privacy Policy should be read in conjunction with our Website terms & Conditions. We do occasionally update this Policy so please do return and review this Policy from time to time.

Registered in England No. 08656105 – VAT Registration Number: GB 169 113 017

©2026 Copyright Gemini Rail Services UK Ltd

Privacy Preference Center